Monday, October 12, 2009

Thanksgiving Day - still working

Another cold day in store with high temps of +6C only. The west side yard has big trenches from the bobcat. Jacky tells me to reassure my neighbour that the side yard will be restored at the end of the job.



The rear porch looks great clad in the new flagstone.



Today more limestone is added to the patio foundation, levelled and the process is repeated.



The Hanson valentia steps are moved into place and work begins on laying the hanson tuscanni stone tiles.



In the meantime the front porch flagstone is to be dry laid to ensure the best configuration.

No comments:

Post a Comment